A grey production planning model on a ready-mixed concrete plant
ENGINEERING OPTIMIZATION, cilt.52, sa.5, ss.817-831, 2020 (SCI-Expanded, Scopus)
- Yayın Türü: Makale / Tam Makale
- Cilt numarası: 52 Sayı: 5
- Basım Tarihi: 2020
- Doi Numarası: 10.1080/0305215x.2019.1698034
- Dergi Adı: ENGINEERING OPTIMIZATION
- Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus, Academic Search Premier, Aerospace Database, Communication Abstracts, Compendex, Metadex, zbMATH, Civil Engineering Abstracts
- Sayfa Sayıları: ss.817-831
- Süleyman Demirel Üniversitesi Adresli: Evet
Özet
The parameters of decision models are not clearly known and they are not exact for most real-life problems. Therefore, this article presents a model of linear programming with grey interval numbers for right-hand-side parameters under an uncertainty case. The purpose of this article is to compare the results of a fuzzy linear programming model and those of four proposed grey linear programming models and to find effective solutions for alternative production planning. The results produced a more effective plan to use as an industrial solution according to a fuzzy linear programming model. The objective function value is about 3% more effective than with the fuzzy linear programming method, and the customer satisfaction of total demand is about 25% more effective for the number of served customers.